Solar array at golden hour
SYSTEM STATUS: ONLINE
EST. ELECTRICAL & SOLAR ENGINEERING

MEACHOPOWERING LIFE

Master of the modern grid. From fault finding and COC certifications to 3-phase installations and full solar systems — we transform raw power into refined utility.

999/ 1000 UPTIME INDEX
Request Inspection
INSTALLATIONS/REPAIRS/FAULT FINDING/COC/GEYSER MAINTENANCE/3-PHASE/SOLAR SYSTEMS
/ 02 — SERVICE CIRCUIT

The Service Circuit

Nine precision-engineered service lines — electrical, solar and generators. Select a component to expand its technical specification sheet.

SVC-01

Solar Systems

Grid-tie & off-grid solar design, installation and maintenance.

  • System sizing & design
  • Grid-tie integration
  • Battery storage
  • Preventative maintenance
SVC-02

COC & Inspections

Certificate of Compliance audits and full electrical inspections.

  • COC certification
  • Compliance audits
  • Defect rectification
  • Safety inspections
SVC-03

3-Phase Power

Industrial 3-phase installation, balancing and maintenance.

  • Phase balancing
  • Motor circuits
  • Distribution boards
  • Load management
SVC-04

Geyser Maintenance

Geyser installation, repair, and ongoing maintenance.

  • Installation & replacement
  • Thermostat & element repair
  • Leak detection
  • Anode replacement
SVC-05

Fault Finding

Diagnostic fault finding and electrical repairs.

  • Circuit diagnostics
  • Tripping faults
  • Wiring repair
  • Thermal inspection
SVC-06

Installations

General electrical installations and upgrades.

  • Lighting & plugs
  • DB upgrades
  • Rewiring
  • Surge protection
GEN-01

Generator Repairs

Diagnostic and repair for diesel and petrol generators, all makes.

  • Fault diagnostics
  • Engine & alternator repair
  • AVR replacement
  • Load testing
GEN-02

Generator Maintenance

Scheduled servicing and preventative maintenance plans.

  • Oil & filter service
  • Cooling system check
  • Battery & starter
  • Service contracts
GEN-03

Generator Installation

Supply, installation, commissioning and changeover switching.

  • Site assessment
  • Supply & install
  • Changeover switch
  • Commissioning
/ 03 — SYSTEM CONFIGURATOR

Configure Your Independence

A frictionless estimate. Set your current load and desired grid independence to generate a baseline solar specification, then request a site inspection.

Current Load50 kWh/day
10100
Desired Independence60%
20%100%
SPEC SHEET / ESTIMATELIVE
PV Panels8 × 550W
Battery Storage4 kWh
Inverter4 kVA hybrid
Est. Daily Yield22 kWh

Indicative configuration. A certified electrician will confirm sizing on site.

Request COC / Inspection
/ 04 — THE CURRENT

Technical Portfolio

Proof of craftsmanship. Full-bleed documentation of completed installations.

Grid-Tie Solar Farm
PRJ-001

Grid-Tie Solar Farm

SPEC SHEET
  • Grid-tie integration
  • Phase balancing
  • 24-panel array
/ 05 — COVERAGE

Powering 582 areas

Generator services, electrical and solar across Gauteng and Rustenburg. Find your area.

View all areas
    base44
    Edit with Base44